
Proof
model as Minimum-cost bipartite matching

- Add dummy jobs with cost 0 to have jobs. ( jobs)
- Every machine has jobs.
- Connect every Job to slot of machine with cost
- Run the jobs in the slots per machine in reveres order.



model as Minimum-cost bipartite matching


